Customization: | Available |
---|---|
Transmission Type: | Flexible |
Rhythm: | Flow Production Line |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1 | Factory building requirement | Size: 2800-3800 m2 (110*30Meters) Ceiling height: 4.2 or 3.8 or 6 meters height. Door size: 5-6 Meters Width Factory building Without column is better, if have column distance more than 6 meters |
2 | Power Requirement | About 600KW |
3 | Air Requirement | About 2800L/Min |
We learned that many customers want to build solar panel production line , but they don't know how to configure the production line and equipment, so that the project has been delayed to start.
Step 1: Test solar cell efficiency: make sure the same power cell to be used in one solar panel;
Step 2: Cut complete solar cell into small pieces;
Step 3: Welding solar cell: welding solar cell to string solar cell;
Step 4: Cutting EVA/TPT: according to the solar panel size to cut the EVA and TPT in the designed size;
Step 5: Lay up: achieve solar string automatic laying on glass EVA, and transporting module to the next process;
Step 6: Visual inspect: check the dirty for the Raw materials;
Step 7: Defect check: uses the EL tester machine to identifying micro-cracks, broken finger wires, and other invisible defects in solar modules;
Step 8: Lamination: after EL tester checking the defects, use solar panel Laminate the raw material into solar panel;
Step 9: Trimming: when the Solar panel get cooling after coming out from laminator, It need Cutting the edges, we call Trimming;
Step 10: Glue: use sealant to glue up on aluminum frame;
Step 11: Framing: use the framing machine to install the aluminum frame;
Step 12: Glue: fill the sealant to aluminum alloy after framing;
Step 13: Install junction box: glue the junction box and install it on the solar panel;
Step 14: IV Test: use solar simulator to test the finished solar panel Electrical performance test like power, current etc and record;
Step 15: Test the panel withstand voltage insulation;
Step 16: Defect check: uses the EL tester machine to identifying micro-cracks, broken finger wires and other invisible defects of finished solar modules;
Step 17: Label;
Step 18: Clean the surface and package.
· Solar Panel IV Tester
1. Factory Layout Drawing:
Step 1: Test solar cell efficiency: make sure the same power cell to be used in one solar panel;
Step 2: Cut complete solar cell into small pieces;
Step 3: Welding solar cell: welding solar cell to string solar cell;
Step 4: Cutting EVA/TPT: according to the solar panel size to cut the EVA and TPT in the designed size;
Step 5: Lay up: achieve solar string automatic laying on glass EVA, and transporting module to the next process;
Step 6: Visual inspect: check the dirty for the Raw materials;
Step 7: Defect check: uses the EL tester machine to identifying micro-cracks, broken finger wires, and other invisible defects in solar modules;
Step 8: Lamination: after EL tester checking the defects, use solar panel Laminate the raw material into solar panel;
Step 9: Trimming: when the Solar panel get cooling after coming out from laminator, It need Cutting the edges, we call Trimming;
Step 10: Glue: use sealant to glue up on aluminum frame;
Step 11: Framing: use the framing machine to install the aluminum frame;
Step 12: Glue: fill the sealant to aluminum alloy after framing;
Step 13: Install junction box: glue the junction box and install it on the solar panel;
Step 14: IV Test: use solar simulator to test the finished solar panel Electrical performance test like power, current etc and record;
Step 15: Test the panel withstand voltage insulation;
Step 16: Defect check: uses the EL tester machine to identifying micro-cracks, broken finger wires and other invisible defects of finished solar modules;
Step 17: Label;
Step 18: Clean the surface and package.
Function:
Used to achieving solar string automatic laying on glass EVA, and transporting module to the next process
Function:
Adopt the method of separating the cell string from the glass, and grab the cell string in the air, then to interconnected solder the head, middle and tail bus bar of the middle wire edition module at a certain height; It has the function of a roll feeding bus bar, bending U and L leads upwards.